A task: Solution: Installation of a fuel consumption control system on fuel preparation modules of 4 main engines, 3 diesel generators and 2 boilers. Installation of toriometers on propeller shafts – 2 pcs, information output…

Cargo vessel «CONESTE»
A linear measurement system for fuel monitoring and metering for the main engines was installed. Diesel generators have been prepared for connection to the system in the future. The boiler has been prepared for connection…

Bulk carrier “Portage”
Objective: To establish control over fuel consumption. Solution: Installation of a differential system on the main engine and 3 diesel generators. Information output to the operator panel in the CPU. Output of information to the…

Cruise ferry «ROMANTIKA»
I-stage: Installing the differential monitoring system for fuel consumption on 4 main engines, 3 auxiliary engines and 2 boilers. Monitoring of the fuel rate transferred from the fuel storage tanks. Installing the fuel additive metering…

Cargo and Passenger Ferry «SILJA SYMPHONY»
Fuel consumption monitoring system for 6 mass flowmeters, group of Main Engines, Diesel-generators and Boiler. Displaying the data on a 15 inch touch screen monitor in ECR and repeater 15 inch touch screen panel on…

Cargo and Passenger Ferry «REGAL STAR»
Installing the differential monitoring system for fuel consumption on 2 main engines. Implementing the linear measuring system on 6 diesel-generators and a boiler. Displaying the data on the operator’s console in the central control room….