
Similar Posts

Bulk Carrier «SCOPE»
Installing the differential monitoring system for fuel consumption on the main engine and 3 diesel-generators. Displaying the data on the operator’s console in the central control room. Transmitting the CSV-format data to the ship’s network….

Trauler «PROJECT 170701»
The specification has been developed and the design has been carried out fully for a Fuel consumption monitoring system and integrated system of automatization and management of technical means (automated control system) of the vessel…

Icebreaker «BOTNIKA»
Monitoring the bunkering line and fuelling on board the ship, displaying data on LCD panels in the engine boiler room. Bunkering system helped the ship’s crew to challenge a lack of 19 tons of fuel…

Tug “Nibulon”
Task: Automation of control of ship mechanisms Solution: – Supply of a centralized control system – Management and emergency alarms – 3pcs – Start-module. Output of information to adjustment work on the system centralized control…

Bulk carrier «QUEEN OF LUCK»
Delivery and replacement of the hydraulic coupling of the propeller shaft of the ocean container ship “QUEEN OF LUCK” of the company Victoria Ocean way Ltd., Athens. In the autumn of 2014, we performed work…

Ferry “Wrango”
A task: Mechanism control automation Solution: Our new automation system has been installed: – APS system – Measurements of levels in ballast and other tanks with information output to the operator panel – Installation of…