Similar Posts
Trauler «PROJECT 1701»
The specification has been developed and the design has been carried out fully for a Fuel consumption monitoring system with the transfer of information to the Customer’s office. SHIPOWNER/ CUSTOMER FEST Project PLACE OF IMPLEMENTATION/…
Hydrographic vessel “Albatross”
Solution: Manufacturing and supply of propeller shaft tachometer “TA-12M” consisting of: -Local indication device (PDI) – 2 pcs. Production and delivery of the panel of signal and distinctive lights “SKILINE-M” for 16 lights, with power…
Icebreaker «BOTNIKA»
Monitoring the bunkering line and fuelling on board the ship, displaying data on LCD panels in the engine boiler room. Bunkering system helped the ship’s crew to challenge a lack of 19 tons of fuel…
Chemical tanker “Sichem Mumbai”
Task: Control over fuel consumption for the Main Engine. Installation of a fuel additive dosing system. Problem identified: Non-transparent reporting system for fuel consumption Solution: Installation of a differential fuel consumption control system on the…
Ferry “Wrango”
A task: Mechanism control automation Solution: Our new automation system has been installed: – APS system – Measurements of levels in ballast and other tanks with information output to the operator panel – Installation of…
Cargo vessel «CONESTE»
A linear measurement system for fuel monitoring and metering for the main engines was installed. Diesel generators have been prepared for connection to the system in the future. The boiler has been prepared for connection…