Similar Posts
Icebreaker «BOTNIKA»
Monitoring the bunkering line and fuelling on board the ship, displaying data on LCD panels in the engine boiler room. Bunkering system helped the ship’s crew to challenge a lack of 19 tons of fuel…
Bulk carrier “Portage”
Objective: To establish control over fuel consumption. Solution: Installation of a differential system on the main engine and 3 diesel generators. Information output to the operator panel in the CPU. Output of information to the…
Cruise ferry «ROMANTIKA»
I-stage: Installing the differential monitoring system for fuel consumption on 4 main engines, 3 auxiliary engines and 2 boilers. Monitoring of the fuel rate transferred from the fuel storage tanks. Installing the fuel additive metering…
Bulk Carrier «SCOPE»
Installing the differential monitoring system for fuel consumption on the main engine and 3 diesel-generators. Displaying the data on the operator’s console in the central control room. Transmitting the CSV-format data to the ship’s network….
Fishing vessel «ATLANTIC HERMES»
The specification has been developed and the design has been carried out fully for a system of differential fuel consumption control on 2x Main engines, 2 diesel generators and a boiler. Installation of the torsiometer…
Trauler «PROJECT 1701»
The specification has been developed and the design has been carried out fully for a Fuel consumption monitoring system with the transfer of information to the Customer’s office. SHIPOWNER/ CUSTOMER FEST Project PLACE OF IMPLEMENTATION/…