Similar Posts
Chemical tanker “Sichem Mumbai”
Task: Control over fuel consumption for the Main Engine. Installation of a fuel additive dosing system. Problem identified: Non-transparent reporting system for fuel consumption Solution: Installation of a differential fuel consumption control system on the…
Bulk Carrier «VOYAGEUR»
Installing the differential monitoring system for fuel consumption on the main engine and 3 diesel-generators. Displaying the data on the operator’s console in the central control room. Transmitting the CSV-format data to the ship’s network….
Trauler «PROJECT 170701»
The specification has been developed and the design has been carried out fully for a Fuel consumption monitoring system and integrated system of automatization and management of technical means (automated control system) of the vessel…
Fishing vessel «ATLANTIC SIRIUS»
The specification has been developed and the design has been carried out fully for the vessel’s fuel metering control system on the Main Engine, for the module of 3 diesel generators and the boiler. Installation…
Passenger and freight ferry “Patria Seaways”
Installing the differential monitoring system for fuel consumption on 2 main engines with displaying the data on the operator’s console in the central control room. Installing the monitoring repeater interfaced with a GPS-module on the…
Hydrographic vessel “Albatross”
Solution: Manufacturing and supply of propeller shaft tachometer “TA-12M” consisting of: -Local indication device (PDI) – 2 pcs. Production and delivery of the panel of signal and distinctive lights “SKILINE-M” for 16 lights, with power…