Similar Posts

Cruise ferry «ROMANTIKA»
I-stage: Installing the differential monitoring system for fuel consumption on 4 main engines, 3 auxiliary engines and 2 boilers. Monitoring of the fuel rate transferred from the fuel storage tanks. Installing the fuel additive metering…

Cargo-passenger ferry “STAR”
Task: Control and automated accounting of fuel consumption at 4 main engines, 3 diesel generators, 2 boilers. Accounting and control of the consumption of ship energy. Monitoring of bunkering (receiving fuel on the ship). Problem:…

Bulk Carrier «SCOPE»
Installing the differential monitoring system for fuel consumption on the main engine and 3 diesel-generators. Displaying the data on the operator’s console in the central control room. Transmitting the CSV-format data to the ship’s network….

Ferry “Wrango”
A task: Mechanism control automation Solution: Our new automation system has been installed: – APS system – Measurements of levels in ballast and other tanks with information output to the operator panel – Installation of…

Trauler «PROJECT 170701»
The specification has been developed and the design has been carried out fully for a Fuel consumption monitoring system and integrated system of automatization and management of technical means (automated control system) of the vessel…

Hydrographic vessel “Albatross”
Solution: Manufacturing and supply of propeller shaft tachometer “TA-12M” consisting of: -Local indication device (PDI) – 2 pcs. Production and delivery of the panel of signal and distinctive lights “SKILINE-M” for 16 lights, with power…