Cargo-passenger ferry “STAR”
Task: Control and automated accounting of fuel consumption at 4 main engines, 3 diesel generators, 2 boilers. Accounting and control of the consumption of ship energy. Monitoring of bunkering (receiving fuel on the ship). Problem:…
Cargo and Passenger Ferry «REGAL STAR»
Installing the differential monitoring system for fuel consumption on 2 main engines. Implementing the linear measuring system on 6 diesel-generators and a boiler. Displaying the data on the operator’s console in the central control room….
Bulk Carrier «PROUD»
Installing the differential monitoring system for fuel consumption on the main engine and 3 diesel-generators. Displaying the data on the operator’s console in the central control room. Transmitting the CSV-format data to the ship’s network.Thanks…
Trauler «PROJECT 170701»
The specification has been developed and the design has been carried out fully for a Fuel consumption monitoring system and integrated system of automatization and management of technical means (automated control system) of the vessel…
Cargo-passenger ferry SUPERSTAR
A task: Solution: Installation of a fuel consumption control system on fuel preparation modules of 4 main engines, 3 diesel generators and 2 boilers. Installation of toriometers on propeller shafts – 2 pcs, information output…
Trauler «PROJECT 1701»
The specification has been developed and the design has been carried out fully for a Fuel consumption monitoring system with the transfer of information to the Customer’s office. SHIPOWNER/ CUSTOMER FEST Project PLACE OF IMPLEMENTATION/…