Bulk carrier «QUEEN OF LUCK»
Delivery and replacement of the hydraulic coupling of the propeller shaft of the ocean container ship “QUEEN OF LUCK” of the company Victoria Ocean way Ltd., Athens. In the autumn of 2014, we performed work…
Icebreaker «BOTNIKA»
Monitoring the bunkering line and fuelling on board the ship, displaying data on LCD panels in the engine boiler room. Bunkering system helped the ship’s crew to challenge a lack of 19 tons of fuel…
Bulk Carrier «PROUD»
Installing the differential monitoring system for fuel consumption on the main engine and 3 diesel-generators. Displaying the data on the operator’s console in the central control room. Transmitting the CSV-format data to the ship’s network.Thanks…
Cargo-passenger ferry “STAR”
Task: Control and automated accounting of fuel consumption at 4 main engines, 3 diesel generators, 2 boilers. Accounting and control of the consumption of ship energy. Monitoring of bunkering (receiving fuel on the ship). Problem:…
Fishing vessel «ATLANTIC HERMES»
The specification has been developed and the design has been carried out fully for a system of differential fuel consumption control on 2x Main engines, 2 diesel generators and a boiler. Installation of the torsiometer…
Fishing vessel «NESSIE»
An automation and control system has been installed: – Main engine control – Control of trawl winches, as well as the length of the etched cable – Navigation lights control The system helped the crew…