Similar Posts
Hydrographic vessel “Albatross”
Solution: Manufacturing and supply of propeller shaft tachometer “TA-12M” consisting of: -Local indication device (PDI) – 2 pcs. Production and delivery of the panel of signal and distinctive lights “SKILINE-M” for 16 lights, with power…
Cruise ferry «ROMANTIKA»
I-stage: Installing the differential monitoring system for fuel consumption on 4 main engines, 3 auxiliary engines and 2 boilers. Monitoring of the fuel rate transferred from the fuel storage tanks. Installing the fuel additive metering…
Cargo-passenger ferry SUPERSTAR
A task: Solution: Installation of a fuel consumption control system on fuel preparation modules of 4 main engines, 3 diesel generators and 2 boilers. Installation of toriometers on propeller shafts – 2 pcs, information output…
Bulk Carrier «PROUD»
Installing the differential monitoring system for fuel consumption on the main engine and 3 diesel-generators. Displaying the data on the operator’s console in the central control room. Transmitting the CSV-format data to the ship’s network.Thanks…
Bulk Carrier «SCOPE»
Installing the differential monitoring system for fuel consumption on the main engine and 3 diesel-generators. Displaying the data on the operator’s console in the central control room. Transmitting the CSV-format data to the ship’s network….
Cargo and Passenger Ferry «SILJA SYMPHONY»
Fuel consumption monitoring system for 6 mass flowmeters, group of Main Engines, Diesel-generators and Boiler. Displaying the data on a 15 inch touch screen monitor in ECR and repeater 15 inch touch screen panel on…